Ilim Group Will Invest over USD 860 Million in Irkutsk Oblast
OREANDA-NEWS. September 15, 2010. Mr. Zakhar Smushkin, Board Chairman of Ilim Group, spoke at a plenary session of the Baikal Economic Forum in
According to Mr. Smushkin, Ilim Group has already invested more than USD 130 million in purchasing high-performance harvesting, wood hauling, road construction and auxiliary equipment in
The Company is currently implementing an investment project to install a new fiber line in
The Chairman of the Board has also covered some of the major issues the Company encountered while implementing this project, including lack of sufficiently experienced construction and installation companies in the region, as well as the need to engage additional workforce, since the peak phase of the project will require up to 1,500 people.
In the area of forest management, apart from the poor road infrastructure, Mr. Smushkin has stressed the issue of low yield of wood from a unit of timberland as compared with the industrially developed countries. A possible solution to the issues mentioned above would be to provide major forest products companies with the right to organize special-purpose harvesting operations on the leased timberland plots. This would allow them to increase harvesting volumes without leasing additional timberland plots, reduce harvesting and hauling costs, and improve forest regeneration quality. In 2010, Ilim Group launched a pilot project to introduce this concept in one of the forestries of the Irkutsk Oblast.
Комментарии