Barda Network Region Increases Exploitation Level
OREANDA-NEWS. September 08, 2010. A lot of work are carried out in the line of increasing of the exploitation level and preparation work to autumn – winter season by the collective of Barda Network Region, during last two months.
Under the information given by above mentioned enterprise to the Press-release of “Azerenergy” JSC 30 faience insulators were substituted with glass ones in Barda TL by 110 kV. 13 concrete towers in Shahar TL, one in Janavarli TL by 35 kV, 2 in Kand TL by 10 kV, 2 in Lambaran TL were substituted with new ones. 2 transformers by 630 kV, 3 by 400 kV, one by 250, 4 by 100 kV were maintenance repaired. Open type cable in 10 km was substituted with SIL type meter in the networks by 0,4 kV. Green mass were cleaned of around of the cables by 0,4 kV.
Lets` noted that, the networks were renewed in the center of the region and at the same time in 8 villages of region around. At present, construction of new type meters, installing of the lines are continued in Aliyanli, Divanli, Lak, Alachadirli villages. Construction of new type meters will be also carried out in 3 villages.
According to the information given by Tartar NR, preparation work to autumn – winter is continued there, the measures are carried out in the line of it. So that, 11 oil circuit breakers by 35 kV, 31 ones by 10 kV were repaired in Tartar s/s by 110 kV, in “Damirchilar” by 35 kV, in “Sarijali” and in “Ismayilbeyli” s/s. The equipments, oil circuit breakers were painted at the s/s.
Lets` also noted that, the transformer by 10 MW in “Ismayilbeyli” s/s was substituted with new repaired one. More than 8 km of the TL by 10,6 and 0,4 kV was repaired, more than 6 transformers were repaired.
By the way, 99 % of scarfed electric power by the private consumer group was repaid in Tartar region, in July of the current year. The total payment was more than 93 %.
Комментарии