Yenisei TGC Prepares for 2010-2011 Period
OREANDA-NEWS. August 19, 2010. JSC “Yenisei TGC (TGC-13)” is actively engaged in preparations for the 2010/2011 autumn/winter period. Along with repair activities and routine preventive and maintenance works carried out at generating plants and heat networks, special attention is attached to accumulation of fuel stocks.
As of August 1, 2010 actual fuel stocks stored up at thermal power plants operated by JSC “Yenisei TGC (TGC-13)” exceed pre-scheduled amounts by 31.9% for coal and 44.3% for black oil.
Yenisei TGC’s coal warehouse reserves amount to 1,009,000 tons with targeted amount of 765,000 tons. Black oil stocks also surpass standard figures. The company’s storage tanks contain 5,300 tons of black oil while the planned amount is 3,700 tons.
Warehouse stock accumulation proceeds in a smooth and steady manner in accordance with the established time schedule. All the thermal power plants operated by the company have actual fuel stocks in excess of rated values.
Ultimate stock required for the autumn/winter period will have been compiled by October 1, 2010. By that time, at least 1,038,000 tons of coal and 6,900 tons of black oil need to be put in storage.
Комментарии