OREANDA-NEWS. March 19, 2010. Global steel pipe and railway wheels producer Interpipe is supposed to supply seamless pipes for the construction of building's cupola for terminal D at international airport Boryspil (Kiev). The volumes of pipes amounts 1400 tons and supposed to be supplied in March.
Oleg Kuzmin, Director for Corporate Affairs, comments:
“The construction of terminal D is one of the projects to be realized as a part of Ukraine's preparations to Euro 2012. In 2008-2009 Interpipe supplied its products for the number of projects aimed at Euro 2012. The most outstanding projects are construction of Dnipro Arena stadium at Dnepropetrovsk, Donbass Arena stadium in Donetsk, Metallist stadium in Kharkov, Kiev Olimpic Stadium in Kiev. The supplies were organized via Interpipe's widespread warehouses network, covering all the key regions in Ukraine”.
Комментарии