Yenisei TGC (TGC-13) Announced Results of 2009 Production Activities
OREANDA-NEWS. February 15, 2010. Production branches of JSC “Yenisei TGC (TGC-13)” located at the
Deviation from planned levels is explained by the fact that the Company’s production branches have been worked by order of the System operator with fixed electric and heat loading. Exceeding of planned levels on electric energy production has been marked at the Krasnoyarsk CHP (by 6.8%) and the Abakan CHP (by 9.9%). Planned heat production level has been exceeded at the Krasnoyarsk CHP (by 9.8%), the Nazarovo GRES (by 2.2%), and the Abakan CHP (by 4.9%).
Main reason of reduction in electric energy production amount in 2009 compared with the previous year shall be explained by general decline in electric energy consumption by the regional industrial enterprises under the conditions of the financial and economic crisis. Moreover, the company has been working within the frameworks of minimum loading implementing the order of the System Operator over the first half-year prior to the accident at the Sayano-Shushenskaya HPP.
At the same time, the Kansk CHP has underlined increase in electric energy production by 8% compared with the year 2008. It shall be connected with putting into operation of a new 12 MWT turbine in September 2009. Heating energy production at the Kansk CHP has increased as well by 7.8% in comparison with the year 2008.
Increase of heating energy production by the company compared with 2008 shall be connected with lowering of external air temperature. Average monthly air temperature in
Increase of heating energy production due to the 2008 level has been noted at the Krasnoyarsk CHP-4 (by 11.8%), the Krasnoyarsk CHP-1 (by 0.27%), the Krasnoyarsk CHP-2 (by 2.5%), the Nazarovo GRES (by 1.3%), the Minusinsk CHP (by 3%), the Abakan CHP (by 1.7%), and the Krasnoyarsk CHP-3 (by 5.8%).
Main production activities parameters of JSC “Yenisei TGC (TGC-13)” in 2009 compared with 2008 parameters
Parameters |
2008 |
2009 |
Established electric capacity, MWT |
2,518.0 |
2,530.0 |
Established heating capacity, Gcal-h |
6,983.1 |
7,068.5 |
Heating energy production, Gcal thousand |
14,450.8 |
14,877.6 |
Efficient production of heating energy, Gcal thousand |
13,241.0 |
13,636.7 |
Electric energy production, KWT-h million |
14,236.0 |
11,276.6 |
Efficient production of electric energy, KWT-h million |
12,506.0 |
9,733.4 |
Amounts of electric and heating energy production by branches of JSC “Yenisei TGC (TGC-13)” in 2009
Branch |
Electric energy, KWT-h million |
Heating energy, Gcal thousand |
|
2,161.324 |
4,538.210 |
|
2,635.751 |
3,749.401 |
|
- |
1,753.827 |
Nazarovo GRES |
4,426.053 |
652.441 |
Kansk CHP |
81.354 |
631.853 |
Minusinsk CHP |
509.581 |
824.638 |
|
1,462.578 |
1,600.514 |
|
- |
329.673 |
|
- |
797.099 |
TOTAL |
11,276.641 |
14,877.656 |