Maltsovsky Portlandcement Improved Production Performance
OREANDA-NEWS. February 10, 2010. As of January 24 ZAO Maltsovsky Portlandcement has produced 85,664 ton of cement, whereof 76,370 ton supplied to customers, that is 54% higher than performance of the previous year.
For the reporting period clinker production has increased by 4.6 (187.1 thousand ton). The clinker will be used by the enterprise for high-quality cement production as construction season begins, and foster development of relations with the consumers and strengthening of leading position of ZAO Maltsovsky Portlandcement in the
Moreover ZAO Maltsovsky Portlandcement proceeds with repairing of the primary technological equipment, a traditional procedure in winter. Reconstruction works of the administrative and amenity building have been resumed, with the third floor of the building planned to be completed.
The first month of production activity of ZAO Maltsovsky Portlandcement in 2010 proves that the enterprise aims at maximum positive results in its development.
Комментарии