OMZ Completes Control Assembly of Reactor Vessel for Kalinin NPP
OREANDA-NEWS. January 21, 2010. OAO Izhorskiye Zavody, part of OMZ Group, has successfully completed the control assembly of the reactor and the supporting ring being built for 4-th unit of
Holding control assembly was carried out in co-operation of OAO OMZ and AEM-Tekhnologii, the engineering company, part of OAO Atomenergomash.
This process operation on the factory is a special test rig and is held with a view to joining the two most important elements of power plant equipment and determination of equipment specifications.
Support ring, with inner diameter of more than
Holding control assembly is an important event in the development of
After the operation support ring is delivered to mounting on a station being built. The body of the reactor will be shipped to the station before the end of this month.
OMZ Group is one of the leading heavy industry companies specializing in engineering, production, sales and service support of equipment for nuclear, oil and gas, mining industries, as well as special steel production and industrial services. OMZ Group’s facilities are located in
Комментарии