Belarus Will Focus more on Compact Power Installations in Coming Years
OREANDA-NEWS. December 30, 2009. Small-scale power generation will be more pronounced in
“Every year we plan to build 20-30 compact cogeneration plants that will burn local fuels. It will rule out the dependence on imported raw stock, will maximize the localization of heating energy for regional towns. The decommissioning of ineffective heating generators will reduce budget costs by around 30-40%,” said Sergei Sidorsky. The projects will be implemented in area centers where one modern cogeneration plant can replace several outdated stations.
The Prime Minister said that over the last two years following an instruction of the head of state pilot projects have been implemented in
The designed capacity of the Pruzhany cogeneration plant stands at 3.7 MW, the designed heating output – 11.85 Gcal/h. The project will allow saving around 900 tonnes of oil equivalent and 11 million cubic meters of natural gas per annum. Once the cogeneration plant is in place, the share of local fuels in the boiler and furnace fuels burnt in the Pruzhany region will increase from 46.5% (1 November 2009) to 75%.
Комментарии