Uralmash Manufactures Equipment for Novotroitsk Cement Plant
OREANDA-NEWS. December 09, 2009. Uralmash Machine-Building Corporation, a part of OMZ Group, had successfully produced the casing for the second cement furnace of the Novotroitsk cement plant currently under construction. The equipment was manufactured at OAO Uralmashzavod according to basic engineering specifications developed by KHD Humboldt Wedag GmbH,
During the production of the second casing Uralmash specialists had improved the underlying technology, which allowed to reduce the amount of labor involved and to shorten the schedule. KHD specialists had remarked upon the high manufacturing quality, involving very tight dimension margins and high ease of assembly.
Launch of the Novotroitsk cement plant with annual capacity of 1.3 million tons is scheduled for the second quarter of 2010. Is it being constructed by OAO Ural Steel (a part of Metalloinvest) and OOO South Ural Ore Refining Company (develops Uralstal’s refuse piles).
Currently Uralmash Machine-Building Corporation is manufacturing the first cement furnace according to KHD specifications for Novoroscement company in
KHD Humboldt Wedag is one of the world’s leaders in the delivery of proprietary patented technical solutions and equipment, as well as provision of construction and design services for the cement industry. Since 1950 KHD Humboldt Wedag has built over 470 plants over the world.
Комментарии