OREANDA-NEWS. October 20, 2009. A special inter-department Commission has carried out examination of readiness of the Krasnoyarsk CHP-3 for operation in the 2009-2010 autumn and winter period from 5 till 8 October. The Krasnoyarsk CHP-3 became the second energy Company branch to receive the Operational Readiness Certificate. Commissions are to examine all energy Company’s production enterprises to be ready for the winter period.

The Commission consisting of directors and specialists of JSC “Yenisei TGC (TGC-13)” and “Rostekhnadzor” Yenisei Interregional Territorial Department has carried out observation of legislation in the field of industrial safety, quality of organization and implementation of production control over industrial safety requirements including issues of labor protection and fire protection, readiness of equipment for operation within the autumn and winter period, state of fuel capacity, equipping of working places, and level of professional skills of personnel.

General station accident prevention training of steps taken by personnel under the conditions of low external air temperature has been carried out during operation of the Commission. The training got a good estimate.

As a result of operation of the Commission, the Operational Certificate of Readiness for the 2009-2010 autumn and winter period of the Krasnoyarsk CHP-3 has been signed without objections.