Alabyano-Baltiysky Tunnel Is under Construction
OREANDA-NEWS. October 2, 2009. Mayor Yuri Luzhkov gave a start to the driving of the Alabyano-Baltiysky Tunnel near Sokol subway station which is to be dug under the green line of the Moscow Metro.
“This development is similar to a neurosurgical operation as the tunnel is being dug under two operating metro lines. The work goes on, the digging under the railway lines is to be completed by the end of
Mr Luzhkov added that the Alabyano-Baltiysky Tunnel was to be prolonged to
According to the official, when it is done, the usability of the tunnel will be doubled as it will ease the traffic on Alabyana and Baltiyskaya streets and link Alabyana and Bolshaya Akademicheskaya streets. It will become an essential element of the fourth ring road in
The 2,150-metre tunnel to be dug to a depth of
The underground highway with 3 lanes in both directions is expected to make the traffic on
The project is implemented by LLC Scientific Production Association Kosmos.
Комментарии