Lukoil Completes Construction of Facility at Yu. Korchagin Field
OREANDA-NEWS. On 28 August 2009 was announced, that a 74.2-m bridge uniting two offshore ice-resistant fixed platforms into one complex has been assembled at Yu. Korchagin field located in the
The basic production facility – offshore platform for drilling, oil and gas treatment and transportation – was assembled at the fixed location. The facility's azimuth shift came to plus 0.2 degrees, horizontal shift – plus
As was reported earlier, the first offshore platform with living quarters, public and medical premises, a helideck and rescue equipment was assembled at Yu. Korchagin field on May 25, 2009.
Yu. Korchagin Field is to be commissioned in December, 2009. The field is located
Комментарии