Industrial Community for Builders of Gremyachinsky GOK Delivered
OREANDA-NEWS. On 24 March 2009 was announced, that at the farm Pimeno-Chern the first stage of the industrial community of OJSC MCC EuroChem was introduced into operation. The event was visited by the first vice governor of the Volgograd Region Alexandr Shilin, the chairman of the Volgograd Regional Duma Vladimir Kabanov, representatives of OJSC MCC EuroChem and the administration of the Kotelnikov district.
- Implementation of such large projects means not only development of the economy in the region and incensement of the tax base but also resolution of a number of social issues – Alexandr Shilin marked. – New production means jobs and development of infrastructure of municipal districts.
OJSC MCC EuroChem continues to prepare for the start-up of the mining enrichment combine in the Volgograd Region in 2012. The company plans to create an industrial community for specialists dealing with preparation for development of the Gremyachinski deposit of potassium salts exercised by the enterprise of EuroChem in Kotelnikov of the Volgograd Region – LLC EuroChem-VolgaKalii.
The community is being erected for workers building the mining enrichment combine. The first occupants are specialists from partner-companies of EuroChem – the German “Thyssen Schachtbau GmbH” and the South African “Shaft Sinkers PTY Ltd”, with whom EuroChem has in July concluded contracts for erection of technological complexes of skip shaft and pit with cage winding at the mine of the Gremyachinski deposit.
Construction of the first stage for the community with an area of about 5 hectares was carried out within extremely limited terms: it began a half-year ago in September 2005. The Pimeno-Chern farm with about 800 residents is located in the Volgograd Region, 12 kilometers from the enterprise LLC EuroChem-VolgaKalii and 34 kilometers from Kotelnikov. Construction of the community is carried out by CJSC Region.
A part of the buildings and facilities of the village designed for 1,000 places has already been introduced into operation (a canteen, 4 hostels with 352 places, a boiling house, energy supply facilities and treatment facilities for effluents).
All buildings and facilities in the village are erected from lightened fast-assembled constructive modules which are fabricated at the Volzhsky Plant in the Volgograd Region.
In September the second stage of delivery of the community facilities is planed - 6 hostels with 100 places each, 2 sport sites, a parking area for motor transport and an administrative building with a medical unit and facilitated territory – everything required for normal and comfort living in the community.
Комментарии