Repair Works Are Held in Imishli HVPN
OREANDA-NEWS. On 08 August 2008 was announced, that for maintenance of consumers with the stable and qualitative electric power in the next “autumn-winter” season are being conducted and is started the spadework at Imishli high-voltage power net.
On it to press-service of joint-stock company "Azerenerji" was informed by director of enterprise Bakykhan Nasirov. As he said, within last two months of current year at lines of electric transmission of different pressure which are registered on balance of Imishli HVPN, at the piece of about 54 km. are carried out repair works. The director of enterprise has told, that major overhaul on transformers by capacity of 16 MVA of substation "Yeni beilagan", by capacity of 25 MVA of substation Beilagan and equivalent oil switches are already carried out. Similar actions are carried also out at substation "Beiuk Kharami", intersection oil switches are capitally repaired.
With the purpose of prevention of corrosion of autotransformers by capacity of 125 MVA, 250 MVA and transformer by capacity of 16 MVA which are maintained at 330-KVt substation Imishli is carried out their painting. B. Nasirov has also noted, that within current year is planned the reconstruction of 35-KVt by extent of more than 26 km. which are stretched from substation "Mughan" up to substation "Chakhar" and from substation "Khaladj" up to substation "Yeni Beilagan".
Telling about the joint Iran-Azerbaijan project, he has told that, within the limits of the project with the purpose of expansion of 330-KVt substation "Imishli" are established 3 jacks. Also civil works are being conducted at 330-KVt PSL between transmission lines Imishli-Shirvan HPS and Imishli-Parsabad. The end of works is stipulated to the near future. It is necessary to note, that to distributive power nets of Imishli regional power supply is being daily on the average transferred about 2,5 million KVt/h of electric power.
Комментарии