Sverdlovsk TTP Prepares Thermal System for Pressure Test
OREANDA-NEWS. On 07 July 2008 was announced, that experts of Sverdlovsk Thermal Power Station have started to lower the temperature of the network water up to 40 degrees for execution of the routine hydraulic tests of water line (pressure tests).
On 17-18 June, Sverdlovsk Thermal Networks (Ekaterinburg branch of OJSC "TGC-9") holds the second stage of the pressure test out of the seven scheduled ones. Hydraulic tests will he held from 0.00 to 6.00 o'clock at supplying water lines of the main and distribution thermal networks without interruption of hot water supply.
Summer repairs campaign is a necessary process of preparation of the heating mains for works in the forthcoming winter season. Reliable and uninterrupted power supply of the city depends on its professional and operational execution in the autumn and winter period.
For today, the interruption of hot water supply connected with a large-scale analysis of hot water due to cold weather atypical of the end of May - the beginning of June is not planned.
You can turn to the housing and municipal organizations domiciliary for clarification of the issues connected with interruption of hot water supply during the forthcoming pressure tests.
Комментарии