Engels Pipe Plant Passed Yearly QMS Analysis
OREANDA-NEWS. March 24, 2008. In the framework of the quality management system (QMS) operating at Engels Pipe Plant (EPP) a yearly QMS analysis was made and discussed in the course of “Quality Day” at the enterprise. EPP used different information to analyze the QMS operation over 2007, in particular: the results of internal checks, reports on process efficiency, results of quality analysis of the products, feedback from the consumers, statistic data.
According to the results of QMS analysis it was established that, as compared with 2006, the efficiency of the following projects was increased: “Human Resources Supply”, “Service and Maintenance of Technical Equipment”.
Besides, the following issues were solved in terms of quality management:
1. Increase of pipe production volume in 2007 no less than 10% on the year-on-year basis. Fact: increase of finished goods production volume by 12% in 2007.
2. Reduction of the amount of claims per ton of produced goods on the year-on-year basis by 0.1%. Fact: no claims concerning pipe products quality in 2007.
3. Confirmation of the winner title of the program “100 best Russian goods” in 1 standard size range of the produced goods.
4. With the purpose of increasing the processing quality of rolling tools and decreasing the output of subquality pipes, 2 mills with numerical program control (NPC) were additionally commissioned. Commissioning these mills will allow saving time for production and repair of rolling tools.
The second supervisory audit was successfully accomplished at the enterprise in 2007 to confirm the compliance of QMS to the requirements of ISO 9001:2000 and the present compliance certificate TЬV CERT No.15 100 21383.
The second supervisory audit was successfully accomplished at EPP in 2007 to confirm the compliance of QMS to the requirements of GOST R state standard ISO 9001-2001 and the present compliance certificate No. ROSS RU.IS40.K00046.
According to the results of external audit a QMS improvement program was developed and is being implemented; quality objectives were defined for 2008.
Комментарии