18.01.2008, 20:07
Engels Pipe Plant Produced 72,000 Tones of Finished Products
OREANDA-NEWS. January 18, 2007. JSC Engels Pipe Plant summarized its 12M07 results. Output of finished goods reached 71.7 thousand tons, out of which water and gas pipes – 56.8 thousand tons, which is 111% vs. 2006, shaped pipes – 14.9 thousand tons (15% growth). Production growth rates, as compared with similar period of 2006, climbed to 112% (64.2 thousand tons of finished products were manufactured over 12M06, water and gas pipes – 51.3 thousand tons, shaped pipes – 12.9 thousand tons), reported company’s press service to SCREEN.
Комментарии