21.11.2007, 19:31
Bob-Tail Plant Put into Operation at Gunashli Field
OREANDA-NEWS. November 21, 2007. A bob tail plant with a capacity of 6.8 million cm/d was put into operation at the platform №14 of 28 May OGED. Being the part of “Gas Program”, this object enables gas-liquid partition of well production and makes it possible securely transport highly productive gas through submarine pipelines. The new bob-tail plant is the part of 26-km high pressure gas pipeline complex which was built from the platform №14 on the Gunashli offshore field to the gas distributing station at “Neft Dashlary” during the last summer. The number of high-flow rate gas-condensate wells connected to the pipeline reaches to 15. New wells from various platforms will also be connected to the pipeline, which is lying at a depth of 11-123 meter.
Комментарии