The First Passport of Readiness to Winter Was Issued
OREANDA-NEWS. November 13, 2007. "Pass to winter" received the Regional dispatch office "Tatenergo". Parameters of annual assessment became the production control over meeting the requirements of labor protection and fire safety, personnel furnishing with necessary instructions and normative technical documentation, realization of the planed tasks for carrying the operational capacity by the plants, readiness to work under emergencies etc.
The Commision for checking the readiness of company to operation in autumn- winter maximal loads included the Director for regime management, Chief Dispatcher of branch of JSC "System Operator - Central Dispatch Office of the single power system" of ODU Middle Volga Mr. Gennadi Pavlov and acting head of department of state power inspection of the Office for technological and environmental control Rostehnadzor for RT Zakaria Bagmanov.
Комментарии