OREANDA-NEWS. After work meeting participated by the heads from different departments of power networks, Nizhnetagilsk power networks of JSC “Sverdlovenergo” received certificate of readiness to work in autumn-winter period 2007-2008. This meeting was meant to discuss the results of 4-days check-up conducted by commission of Sverdlovenergo to estimate the readiness of power networks to work in winter period.

The same certificates with “good” grade received other 6 districts of power networks which enter the structure of Nizhnetagilsk power networks: Nizhnetagilsk, Verkhneturinsk, Verkhnesaldinsk, Nevyansk, Petrokamensk and Nizhneturinsk.