In September Industrial Branches of TGK-9 Worked under the Schedule
OREANDA-NEWS. October 11, 2007. Results of industrial activity of TGC-9 in September, 2007 were summed up.
For this period of power station of the company developed 1,1 billion kWh electric energy, that a little more than planned targets.
The industrial branches of the company, located in territory of Perm area, developed 439,4 million kWh of electric power in August, or 92,3 % from the plan, in Sverdlovsk area - 412,2 million kWh, exceeded the plan for 6,5 %, in Republic Komi - 239,9 million kWh, that on 5,1 % more than planned targets.
In September, 2007 stations and boiler-houses of TGC-9 released 2 million Gcal of thermal energy that makes 97 % from the plan. Industrial branches of the company in the Perm area released 652,1 thousand Gcal of heat that makes 97,2 % from the plan, in Sverdlovsk area - 1,1 million Gcal, it is 98,5 % from the plan, in Republic Komi - 336,1 thousand Gcal of thermal energy, it is 92,6 % from planned targets.
Insignificant underfulfilment of the plan on heat issue is connected with the warm weather which established in September in all regions of activity of TGC-9.
Комментарии