Industrial Branches of TGC-9 Worked under the Planned Schedule
OREANDA-NEWS. September 25, 2007. Results of industrial activity of "TGC -9" were summed up in August, 2007.
For this period the power station of the company developed 868,6 million kwh electric energy, that a little more then planned targets. The industrial branches of the company located in territory of the Perm area, in August it developed 400,5 million kwh the electric power, in Sverdlovsk area - 257,8 m illion kwh, in Republic Komi - 210,3 million kwh.
In August, 2007 station and boiler-houses of TGC -9 released 1,5 million Gcal of thermal energy that makes 98 % from the plan. Industrial branches of the company in the Perm area released 546,4 thousand Gcal of heat, in Sverdlovsk area - 855 thousand Gcal, in Republic Komi - 90 thousand Gcal of thermal energy.
Комментарии