New Equipment Has Been Launched at Kursk NPP
OREANDA-NEWS. On August 22, 2007 a new computerized system has come to replace the turbine generator temperature control and testing system of the 1st and 2nd units of Kursk NPP, reported the press-centre of Rosenergoatom.
The new system informs the control boards of the units about the temperature of the generators, warns the operators about deviations that may cause accidents and makes electronic records of temperature changes over a long period of time.
The employees of the metrology department have tested the system and have confirmed its efficiency. This proves that the management of Kursk NPP was right when deciding to launch the system.
Комментарии