EP2K Is Being Tested on the Sherbinka Test Range
OREANDA-NEWS. The first Russian DC passenger locomotive designated EP2K-001 and manufactured by Kolomensky Zavod (KZ, a CJSC Transmashholding member) was sent to the VNIIJT test range in Sherbinka for integrity and durance tests on July 05, 2007.
The integrity and durance tests are a part of the EP2K acceptance tests (combined with certification tests).
As of now, the second electric locomotive (EP2K-002) is undergoing adjustment tests in Sherbinka to be followed by a 5,000 km exploitation run.
The EP2K tests are planned to be completed in the third quarter of 2007.
Комментарии