Investment Programme of “Sverdlovenergo” Public Company for 2007 is Executed
OREANDA-NEWS. May 24, 2007. Power engineers of “Sverdlovenergo” Public Company have started the reconstruction of substation “Martush” which is on the territory of East power networks. Installation of the second transformer with capacity of 10000 kW will make it possible to cover growing public requirements.
Reconstruction of high voltage line – 110 kW “Malakhit-Ufaley” on the territory of Western power networks has come to the end. Power transmission line supports were changed from wooden to reinforced concrete on the length of 12.7 km in 2007. It improved reliability of power link between Sverdlovenergo and Chelabenergo. The total length of reconstructed line is about 32 km.
Works on replacement of transformer at substation “Pionerskaya” for a more high-powered are conducted on the territory of Artemovsk power networks. The same time reconstruction of substations Egorshino and “Chernovo” takes place.
Second transformer with capacity of 6300 kW is installed at substation “Balair” on the territory of Talitsk networks.
To increase reliability and better the voltage quality, distribution net in villages Deevo of Alapaevsk region, Severny and Bolshoi Istok of Sysert region is in the process of reconstruction.
In 2007 it’s planned to invest totally 1 bln 600 mln rbl. For the moment selection of contractors for design engineering and construction of objects at the cost of 1 bln 200 mln took its place.
According to investment programme for networks’ development till 2011 by Sverdlovenergo Public Company, about 13 bln rbl invested in this development.
Комментарии