In Mar 2007 Kolsk NPP Fulfilled 104,8% of the Plan
OREANDA-NEWS. The plan for 2007 is 10,066bln KWh. The plan for Apr 2007 is 792mln KWh. The plan for Mar has been fulfilled by 104,8%, reported the press-centre of Kolsk NPP. As of Apr 2 2007 the plant has 3 operative units: 1st, 2nd and 4th.
The plant is operating at a capacity of 1105 MW. On Apr 4 the plant is starting planned preventive repairs at all of its units. The units will be repaired in turn. The 3rd unit will be stopped the first - on Apr 4 till June 2 2007. Last week the radiation background at the plant and in the nearby area was within 0,07-0,11 mSv/h, with the natural radiation background in Russia being 0,04-02 mSv/h.
Комментарии