The Volgograd petroleum refinery will be brought out to its capacity by the first of May
OREANDA-NEWS. The schedule of brining out the limited liability company “LUKOIL-Volgogradneftepererabotka” to its capacity is arranged. According to the schedule the petroleum refinery will show the planned performance of the production by the first of May, 2007.
Let us remind you, that on the tenth of March, 2007 there was an ignition at the ELOU-AVT-6 plant (fuel production) of the JSC “LUKOIL-Volgogradneftepererabotka”. There were no victims as the result of the incident. The ecological situation is normal and there were no pollution of the soil.
Based on Vladimir Nekrasov, the first vice-president of the JSC “LUKOIL” words, who came to the petroleum refinery immediately, the cause of suspicion was the equipment depressurization. And it could cause the spontaneous ignition of the oil products.
The damage will be fully compensated by the insurance companies.
Комментарии