OREANDA-NEWS. Vagit Alekperov, LUKOIL President, and Vladimir Torlopov, Head of the Komi Republic, took part in the ceremony of commissioning a station of automatic loading at the LUKOIL-Uhtaneftepererabotka Refinery.
 
The new automatical complex ensures a high efficiency of loading tank trucks with petrochemicals, the exact control and registration of the shipped oil products, reduction of environmental discharge.  
 
The renovated receiving terminal has 2 400 cubic metres of volume and retains petrochemicals stock for several days.  
 
Capital investments in the project exceeded 178 billion roubles.