By Year-End RAO “UES of Russia” to Spend over RUB43 Billion on Repair Work
OREANDA-NEWS. The Board of RAO “UES of Russia” received and noted a report on the preparations at RAO UES companies for the 2006-2007-winter period.
Within the framework of repair works, by 1 August 2006, 15,216 MW of turbine capacity had been repaired at RAO UES thermal power plants; power boilers had been repaired with an aggregate output of 71,361 t/h, and hot water boilers with a steam output of 4,025 Gcal/h. Also, 187.9 km of heating networks had been replaced.
By year-end, over RUB43 billion is planned to be spent on the repair work.
Комментарии