OREANDA-NEWS. The steel-smelting manufacture of the Guryevsk Metal Works (GMZ) has performed the plan on melt of liquid steel for 2006.

According to the press-service of GMZ, on December 14 steel-workers of the enterprise have produced 195 thousand 161 tons of own liquid steel from the beginning of this year, thus having executed the annual norm.

Also there is the basis to consider that the enterprise will smelt 205 thousand tons of steel by the end of this year and GMZ will overcome the 200-thousand limit on manufacture of steel for the first time in its history.

Super-scheduled 10 thousand tons of steel will allow producing 9 thousand 250 tons of profiled iron, or 50% of the monthly plan on output of this kind of production. It will enable to make 9 thousand 100 tons of steel spheres that is equal almost to two monthly plans on their manufacture.

Together with growth of manufacture improvement of quality of the steel is also marked.