Overhaul of Pipe Press Workshop No.2 completed at the Volzhsky Pipe Plant
OREANDA-NEWS. A major overhaul has been completed at Pipe Press Workshop No.2 (TPC-2) of the Volzhsky Pipe Plant (VTZ), a branch of the Tube Metallurgical Company (ТМК).
According to the press service of TMK, in the course of the overhaul, the following equipment was renovated and reconstructed: upper hob of vertical press “2500”; container holder of horizontal pressing line “2000”; rail track of press “5500“ output trough; furnace of the thermal division; cutoff and chamfer machines, as well as the inspection table of the pipe finishing division.
Комментарии