Transmashholding Delivered Six NP1 Industrial Traction Units to the Russian Mining-and-Processing Works within the First Ten Months of 2006
OREANDA-NEWS. Transmashholding has delivered six NP1 industrial traction units manufactured by Novocherkassk Electric Locomotive Plant to the largest Russian mining-and-processing works within the first ten months of 2006.
According to the press service of Transmashholding, the NP1 industrial traction units have been delivered to JSC Karelian Pellet (Karelsky Okatysh), Kachkanarsky and Stoylensky mining-and-processing works to become operational with quarry railways.
The pilot NP1 was produced by the Novocherkassk Electric Locomotive Plant for Kachkanarsky mining-and-processing works in 2003. The mass production has been performed since 2004.
Since 2004, Novocherkassk Electric Locomotive Plant has produced the total of 17 NP1 industrial traction units, six of them manufactured within the first ten months of 2006. Under the production plan the plant is to produce another two NP1 units this year.
Комментарии